Completed Contracts
Brick Lane
JOB NO: 241125
DESCRIPTION: Painting Works
Client: B & M McHugh Ltd 29a Footscray Road New Eltham London SE9 3UL
Site Agent: Dave Otter
Value: £16,750
Duration: October 2009 for 2 weeks
THE WORKS:
The works involved working within encapsulated scaffold, 1500 psi pressure wash to remove salts and contaminants, We grit blasted to standard SA 2.5 and then applied the paint to Network Rail specification XM92(M21).
For more information on Brick Lane please email us
Gerrards Cross Railway Station
JOB NO: 241128
DESCRIPTION: Painting Works to Canopy
Client: Network Rail P O Box 4145 Manchester M60 7WZ
Site Agent: Dave Otter
Value: £28,347
Duration: January 2010 for 3 weeks
THE WORKS:
During green zone protection (T3 and T2H), we carried out pressure washing works to the platform canopy. We also carried out preparation and painting works to all previously decorated surfaces of the canopy including supporting structure, fascias, gable panels and roof soffit.
Cleaning was carried out to both sides of canopy glazing. Cleaning of all rainwater goods including valley gutter and ensure free flowing was also undertaken.
We replaced both external down pipes located within the 6 ft Canopy.
For more information on Gerrards Cross Railway Station please email us
Leman Street
JOB NO: 241103
DESCRIPTION: Painting Works
Client: Kier Rail Civils Framework Ocean House Waterloo Road Chelmsford Essex CM1 1BD
Site Agent: Dave Otter
Value: £152,746
Duration: April 2008 for 14 weeks
THE WORKS:
Roadside – fully encapsulated scaffold with extraction. 1500 psi pressure wash to remove salts and contaminants. Dry grit blast to SA 2.5. Applied paint to Network Rail specification M20. 1700 m2.
Trackside – 4000 psi pressure wash with munro spinning head. Power disc corrosion sores and applied Network Rail paint specification M24. 400 m2.
All works carried out in budget and on time
For more information on Leman Street please email us
St Mary’s Lane
JOB NO: 241105
DESCRIPTION: Painting Works
Client: Kier Rail Civils Framework Ocean House Waterloo Road Chelmsford Essex CM1 1BD
Site Agent: Dave Otter
Value: £55,664
Duration: April 2008 for 6 weeks
THE WORKS:
Trackside – 4000 psi pressure wash with munro spinning head. Power disc and needle gun corrosion. Applied paint to Network Rail specification M24. Surface area 600 m2.
Roadside – fully encapsulated scaffold. 1500 psi pressure wash to remove salts and contaminants. Wet grit blast to remove lead coated paint. Cleared and removed hazardous waste. Dry grit blast to standard SA 2.5. Applied paint to Network Rail specification M20. Surface area 1200 m2.
Works carried out during half road closure.
Works completed on time.
For more information on St Mary’s Lane please email us
St James Road
JOB NO: 241107
DESCRIPTION: Painting Works
Client: Kier Rail Civils Framework Ocean House Waterloo Road Chelmsford Essex CM1 1BD
Site Agent: Dave Otter
Value: £29,398
Duration: April 2008 for 3 weeks
THE WORKS:
Trackside – 1500 psi pressure wash to remove salts and contaminants. Power disc corrosion sores. Applied paint to Network rail specification M24. Surface area 200 m2.
Roadside – fully encapsulated scaffold. 1500 psi pressure wash to remove salts and contaminants. Wet grit blast to remove lead coated paint. Cleared and removed hazardous waste. Dry grit blast to standard SA 2.5. Applied paint to Network Rail specification M20. Surface area 500 m2
Works carried out during half road closure.
All works completed on time.
For more information on St James Road please email us
Thorpe Le Soken
JOB NO: 241115
DESCRIPTION: Painting Works
Client: Kier Construction Limited Ocean House Waterloo Road Chelmsford Essex CM1 1BD
Site Agent: Dave Otter
Value: £52,263
Duration: January 2009 for 14 weeks
THE WORKS:
The works were to the underside of bridge soffit – 4000 psi pressure washed with munro spinning head. Mechanical preparation to corrosion sores. Painting to Network Rail specification M24. 800 m2.
Roadside parapet – fully encapsulated scaffold. Wet grit blasted to remove lead coated paint. Removed hazardous waste. Dry blasted to standard SA 2.5. painting to Network rail specification M20. 250 m2.
Trackside handrails and girders – 4000 psi pressure washed with munro spinning head. Mechanical preparation to corrosion sores. Painting to Network Rail specification M24. 350 m2.
For more information on Thorpe Le Soken please email us
Seven Sisters Road
JOB NO: 241116
DESCRIPTION: Painting Works
Client: Kier Rail Civils Framework Ocean House Waterloo Road Chelmsford Essex CM1 1BD
Site Agent: Dave Otter
Value: £140,774
Duration: February 2009 for 8 weeks
THE WORKS:
Trackside – 4000 psi pressure wash with munro spinning head to parapet and deck. Power disc corrosion sores. Applied paint to Network Rail specification XM92 (M24). Surface area 970 m2.
Roadside parapet – fully encapsulated scaffold. 1500 psi pressure wash to remove salts and contaminants. Wet grit blast to remove lead coated paint. Cleared and removed hazardous waste. Dry grit blast to standard SA 2.5. applied paint to Network rail specification XM92(M21). Surface area 540 m2.
Roadside soffit and cross girders – 4000 psi pressure wash with munro spinning head. Power disc corrosion sores. Applied paint to Network Rail specification XM92 (M24). Surface area 1300 m2. Works were carried out during night time lane closures.
All works completed on time and in budget.
For more information on Seven Sisters Road please email us